Technical datasheet
- Filling of 5 kg and 10 kg composite domestic cylinders (butane)
- Filling of 50 kg industrial steel cylinders (butane)
- Capacity of 220 cylinders/hour
Installations
- 4000 T mounded Storage
- Semi-automatic Filling Line
- Fire Protection System
- Utilities: Electricity and Compressed Air
- Gauging and Detection Systems
- Supervision and Automation System
- Ship Connection Skid
Services
- Basic Design / Detailed Design / Execution Design
- Equipment Supply
- Consolidation and Inspection
- Packaging and Delivery
- Supervision, Technical Management and Coordination
- Commissioning
Reduce costs, optimize space, support growth
The success of an LPG depot starts with solid organization and effective coordination of all stakeholders. With time differences of up to 12 hours, the challenge is real. Salta Energy knows how to strike the right balance between precision and flexibility — that’s where our experience makes the difference.
Once coordination is in place, the technical work begins. Salta Energy turns ideas into reality: 4000 T of storage, maritime transport, 300 m offshore hoses, 400 m of buried piping, and mounded tank installation. Each step is an engineering challenge, met with precise planning and complete on-site expertise.
After the design phase, logistics takes over. Salta Energy coordinates the maritime transport of all equipment, strictly following the project schedule. Each item is tracked, numbered, and quality-checked. The result: everything arrives on time and as planned, enabling fast and seamless construction.
Thanks to full 3D modeling, Salta Energy visualizes the entire depot before breaking ground: interface points are identified, conflicts resolved, deliveries precisely scheduled, and piping prefabricated in Europe. The result: a smooth, faster construction process, perfectly aligned with the promised budget, timeline, and quality.
Commissioning is the final and most critical step — where everything comes together. Versatile and responsive, the Salta Energy team safely completed the gassing-up and start-up of the installation in just three weeks. The result: an operational depot, ready to receive its first vessel right on schedule. Yet another proof of our ability to handle everything, from the first study to the final turn of the key.
Once the center is operational, Salta Energy remains by your side with its Procure and Procare services. Our goal: to ensure the long-term performance, reliability, and durability of your installation.